BBC STUDIOS – CARDIFF

Client
ISG PLC

Services Provided
Bulk Excavation, Contaminated Land, Disposal, Import of Recycled Crushed 6F2, Installation of Piling Mat, Installation of Temporary Vehicular Access Ramps.

Duration
3 months

Value Range
Over £2-2.5 million

Key Stats
– 99,000T of earth moved in 11 weeks
– Frequency of loads peaked at 144 loads per day. (A FULL wagon loaded and off site every 4 minutes!!)
– Import of 13,000T of crushed 6F2 for piling mat and temporary ramps
– Installation of 7,500m2 of teram and piling mat

Project Gallery

Need Further Information? Call one of our team on 02920 36 99 77

Need more information about the services within this project? Call 02920 36 99 77 for further details.
RETURN TO CLIENT CASE STUDIES

SERVICE TAGS

Click on the tags below to view the associated service that we offer.

DEMOLITIONASBESTOSLAND REMEDIATIONSTRIP OUTRECYCLINGPILING MATCRUSHINGEMERGENCY WORKSFIRE DAMAGENFDCCONTAMINATIONLISTED BUILDINGSSTRUCTURAL ALTERATIONS

WHY CHOOSE US?

✓ We aim to recycle 95% of waste.
✓ Safety a priority.
✓ Over 30 years experience.
✓ Quality service.

SECTORS WE WORK IN

• Residential
• Commercial
• Leisure
• Industrial
• Food
• Manufacturing
• Education
• Health
• Prisons
• Energy and Utilities

Awards & Accreditations

>
<